Bilge reinforcement - Part 2

Read Part 1 After careful surface preparation the bilge reinforcement project continued with laying the new laminate. I consulted with West System on what fabric to use and they suggested biaxial cloth without chopped strand matting. The biaxial cloth is very strong and CSM would just add weight. We bought 600g biaxial cloth with 45/45 degree strands from Composite24 and West System 105 epoxy with 206 fast hardener at a local marine store. Cutting fabric The work was done in sections, we started with the bilge bottom/floor while the keel nuts and washers were removed. It got 4 layers that come up 10cm at the bilge sides. This area gets most of the loads and we wanted to reinforce it by connecting the fabric on the bottom to the one to be layed on the sides. 4 layers on the bottom In theory these types of reinforcements are suggested to be done either with the keel dropped or while the keel is hanging so it's not compressing the joint while the boat is stan