This is a list of the boatprojects we're planning to complete a given year. Big projects may be carried over to the next year.
2021 (planned)
- Finish all the paint jobs (red-stripes, transom, cockpit instrument holes)
- Paint the bottom
- Install a bow windlass, redesign the anchor locker
- Replace the running rigging, lead all (most) lines to the cockpit
- Fix the fridge box leak
- Go through the shore power (220V) system
- Get new sails
- New lazy bag
- New Sprayhood
- Replace the acrylic glas in the Lewmar hatches
- LED interior lights
2020
- Bilge and keel reinforcement (done)
- Install a new bilge pump (done )
- Change the Sail Drive diaphragm, shaft seal, line cutter and anode (done)
- Replace the rusty engine mount adjustment plates (done)
- Check/clean the heat exchanger on the engine and bleed the system (done)
- Finish the big electrical refit project (in progress)
- Upgrade the generator on the engine (done)
- Remove the old TWC regulator (done)
- Move the positive busbar to the other side of the bulkhead (done)
- Battery box and engine battery isolation switch (done)
- Replace the wiring to the DC panel (done)
- New DC panel (in progress)
- Change all water hoses, the freshwater pump and taps, replace the water heater (done)
- Install new seawater tap in the galley (done)
- Finish the NMEA2000 cabling (done)
- De-mount the steering pedestal to run NMEA2000 cabling inside (done)
- Connect the VHF/AIS to the network (done)
- Replace the propane hoses inside the boat, install a 2nd gas leakage and a smoke detector (in progress)
- Clean the diesel tank (done)
- New roller-furling (done)
- Polishing/Repainting the new red-stripes (in progress, to be continued in 2021)
- Service the autopilot wheel drive (done)
- Redesign the solar system (in progress, to be finished in 2021)
- New cockpit speakers and VHF external speakers (done)
- Replace the ventillators (done)
- New lifelines (done)
- Remove all bottom paint (in progress)
2019
- Thru-hull and seacock replacement (done)
- Service the autopilot wheel drive (carried over to 2020)
- Re-wire the mast (new VHF and wind sensor cables), change all lights to LED (continued in 2020)
- Install new Wind, Log, Depth instruments (done)
- Big Electric Project (continued in 2020):
- Go through all the wiring
- Install new batteries (done)
- Install a battery splitter and battery monitor (done)
- Redesign the engine room storage area, add a new shelf or reinforce the old one (done)
- Install a new bilge pump (carried over to 2020)
- Inspect the keel bolts and reinforce the stringers (continued 2020)
- Refresh the propane system (change valves, regulator and flexible hoses) (continued in 2020)
- Change all water hoses, the freshwater pump and taps, replace the water heater (continued in 2020)
- New plumbing in the galley and head (done)